What Is an Overhead Rate and How Do You Calculate It?

An overhead rate is the amount of shared running cost a business adds to each job for every dollar or hour of a chosen base, such as direct labor cost, labor hours or total direct costs. You calculate it before the year starts by dividing budgeted overhead by the budgeted total of that base.

If a roofing company expects $300,000 of overhead and $600,000 of crew wages next year, its overhead rate is 50% of labor, so a job with $10,000 of crew wages picks up $5,000 of overhead.

  • George Mahoney
  • 9 min read

Why contractors need an overhead rate

Every job uses things no invoice ties to it: the office that scheduled it, the truck that hauled the crew, the insurance that let you bid at all. A job report that shows only materials, labor and subs makes every job look better than it was. That's why job costing for contractors treats overhead as its own cost category, and the overhead rate is how each job gets its share.

The catch is timing. You won't know the year's actual overhead until the year is over, but you're pricing jobs in March. So the rate comes from a budget. The OpenStax managerial accounting textbook calls this a predetermined overhead rate: estimated overhead divided by the expected level of activity, set before the fiscal year begins.

The overhead rate formula

Overhead rate = budgeted overhead for the year / budgeted total of the allocation base

The top number is every shared running cost you expect: office staff, rent, insurance, trucks, software, the owner's office time and the rest of your overhead costs. The bottom number is the allocation base, the thing you'll measure on every job to decide how much overhead it carries. Both cover the same period, normally your fiscal year.

Measure the base the same way in the budget and on the jobs. If the 20,000 hours in your budget include shop cleanup and training that never land on a job, the rate comes out too low and falls short every month. Budget only the hours you'll actually charge to jobs.

Choosing an allocation base

OpenStax lists direct labor hours, direct labor dollars and machine hours as the usual bases in manufacturing. Contractors mostly use three.

Direct labor cost means field wages charged to jobs, usually with the payroll taxes, workers' compensation insurance and benefits that ride on them (often called labor burden). It suits labor-heavy trades like painting, electrical service and landscaping maintenance, where overhead grows with the number of crews.

Direct labor hours works much the same, except a job doesn't pick up extra overhead just because your most expensive tech worked it.

Total direct costs adds materials, subcontractors and equipment rentals to labor. It suits general contractors who sub out much of the work, where office effort follows the size of the whole job rather than your own crew hours.

If your work mixes both kinds, you can split overhead into two pools, for example crew-related overhead on labor hours and purchasing and project management overhead on materials and subs. It takes more setup, but it stops material-heavy jobs from looking cheaper than they are.

Worked example: one contractor, three rates

A residential remodeling contractor with three crews budgets next year at $420,000 of overhead. It expects $700,000 of direct labor cost over 20,000 job hours, and total direct costs of $2,100,000: labor of $700,000, materials of $850,000, subcontractors of $450,000 and $100,000 for equipment rentals and dumpsters.

Now apply each rate to one job. A kitchen remodel takes 240 crew hours. Two senior carpenters did most of it, so labor averages $38.50 an hour against a company average of $35, for $9,240. Add $14,500 of cabinets and materials, $6,100 for the electrician and countertop installer and $500 for a dumpster, and direct costs come to $30,340.

Allocation baseBudgeted baseOverhead rateOverhead on the kitchen job
Direct labor cost$700,00060% ($420,000 / $700,000)$5,544 (60% of $9,240)
Direct labor hours20,000 hours$21.00 per hour ($420,000 / 20,000)$5,040 (240 x $21.00)
Total direct costs$2,100,00020% ($420,000 / $2,100,000)$6,068 (20% of $30,340)

Same job, three answers, $1,028 apart. The direct-cost base loads this job hardest because it's heavy on cabinets and subs. The hours base loads it least because it charges every hour the same, whoever worked it.

None of the three is wrong. The right base is the one that tracks what drives your overhead. This contractor's overhead is mostly trucks, supervision and crew support, which grow with crew size, so either labor base fits. It picks labor cost, and the job's full cost is $30,340 + $5,544 = $35,884. Profit goes on top of that number, not inside it.

Under-applied and over-applied overhead at year end

Because the rate comes from a budget, the overhead you apply to jobs almost never matches what you actually spend. If actual overhead is higher than what jobs absorbed, the gap is under-applied overhead. If jobs absorbed more than you spent, it's over-applied.

Here's the remodeler's year, using the 60% labor-cost rate:

Year-end checkBudgetActual
Overhead costs$420,000$432,000
Direct labor cost on jobs$700,000$660,000
Overhead applied to jobs at 60%$420,000$396,000
Under-applied overhead$0$36,000

Jobs absorbed $396,000, but overhead cost $432,000, so $36,000 is under-applied. Two things caused it. Spending ran $12,000 over budget, mostly an insurance renewal. And labor cost on jobs came in $40,000 under plan, so at 60% the jobs picked up $24,000 less overhead than the budget assumed. Together, $12,000 + $24,000 = $36,000. This split measures both causes against the original budget. If some overhead drops when work slows, like fuel, part of that $24,000 is really extra spending.

The second cause is the one people miss. Even if you spend exactly what you budgeted, a slow year leaves overhead uncovered, because the rate was built for more work than you did. For the year, your job reports overstated total job profit by $36,000, and your bids ran a little low. If next year's budget is $442,000 of overhead on $680,000 of labor, the new rate is 65%.

It can go the other way. If labor had come in at $760,000 and overhead at $425,000, jobs would have absorbed $456,000, so $31,000 would be over-applied. Your bids carried more overhead than you needed, which may have cost you some work.

If your books post applied overhead to an overhead account, as manufacturers and some larger contractors do, the leftover balance gets cleared at year end. The OpenStax section on under- and over-applied overhead shows the usual entry: debit cost of goods sold (the expense line for work you've sold) and credit the overhead account when overhead is under-applied, and the reverse when it's over-applied.

Bigger companies, or bigger gaps, may spread it across work in process (jobs still open), finished goods (completed, unsold items) and cost of goods sold instead. Your CPA decides how your books handle it.

Don't mix this up with over- and under-billing on a work-in-progress (WIP) report, which compares what you've billed on a job with what you've earned. Under-applied overhead is about cost, not billing.

Common overhead rate mistakes

  • Reusing last year's rate. Insurance, rent and wages change, so rebuild the budget every year.
  • Leaving out the owner's office time. If you'd have to pay someone to do it, it belongs in overhead.
  • Waiting until December to compare. Check applied against actual overhead monthly or quarterly, because a $3,000 gap you spot in April is easier to fix than $36,000 at year end.
  • Forcing one rate onto very different work. Service calls and large remodels may need separate rates or bases.

Keeping the numbers behind the rate honest

The rate depends on two inputs: overhead coded to overhead accounts and job costs coded to the right job. Shop supplies charged to a job inflate that job and shrink your overhead pool.

On the cards you already have, a tech swipes, Clyr texts them, and they reply with a photo of the receipt. The expense lands in your books coded to the right job. Job costing in Clyr adds budget versus actual by job and cost code, which helps with the direct-cost side of your rate.

FAQs

Is an overhead rate the same as overhead as a percentage of sales?

No. Overhead as a percentage of sales is a ratio for watching the business over time: $300,000 of overhead on $2,000,000 of revenue is 15%. An overhead rate is built on a cost base so it can be added to job costs. If that same contractor has $1,500,000 of direct costs, its rate is 20% of direct costs. Adding 15% to job costs would under-price every job.

Should labor burden go in the base or in overhead?

Either can work if you're consistent. Most contractors put payroll taxes, workers' comp and benefits on field wages into direct labor cost, since they grow with every hour worked. If you leave them in overhead, the overhead pool gets bigger and a labor-cost rate rises to match. Moving them mid-year without rebuilding the rate counts them twice or not at all.

How often should you update an overhead rate?

Once a year, from your budget. Change it mid-year only when something big shifts, such as a new office, a lost crew or a jump in insurance, and use the new rate on new bids only. A rate that changes every month makes jobs bid in spring impossible to compare with jobs bid in the fall.

Can you bill your overhead rate to a customer?

On a fixed-price job, not as a charge of its own, because overhead sits inside your price. On a cost-plus job, where the customer pays your costs plus a fee, read the contract, which usually says which costs are reimbursable and what the fee has to cover. If office costs aren't reimbursable, your fee has to carry them, and your overhead rate shows how large that fee needs to be.

What is a normal overhead rate for a contractor?

There's no standard figure, partly because the number depends on the base. The remodeler in this article has a 60% rate on labor cost and a 20% rate on direct costs at the same time, for the same overhead. Compare your rate with your own past years on the same base, and treat any published benchmark with care unless it says what base it uses.